top of page
Forfar Petrol Filling Station Re-tank
AMCA have been involved in replacement of tanks, pumps, canopy, drainage, surfacing and remediation works at the Shell Forfar.
​
There have been multiple challenges on site, due to an exceptionally high water table. The mass concrete backfill has been identified as the most suitable solution, to avoid any Health and Safety risks of the tanks being pushed up and out of the ground by the water pressure.
bottom of page